Aviation Projects has provided assistance to the Wagner Group from the initial planning approval through to the construction and operation of Brisbane West Wellcamp Airport and continues to provide valuable ongoing advice and support.
Aviation Projects provided expert advice and guidance on a range of matters including the preparation of initial demand forecasts and scope of aircraft operations, concept layouts, concept airspace and aircraft flight paths and consideration of various other planning and operations matters. They have also provided advice on aeronautical infrastructure requirements and costs and operational advice on a variety of matters. Aviation Projects was able to assist with the introduction and ongoing operation of B747-800F aircraft by preparing a safety case that was approved by CASA.
Managing Director, Keith Tonkin, is thoroughly professional in all of his work and takes pride in providing a tailored solution that considers all aspects of a client’s strategic intent, including the short and long term implications of various recommended actions.
Aviation Projects has been integral to the success of our airport and continues to be a valued advisor to our business.
Aviation Projects is pleased to have assisted RES in securing development approval for Twin Creek Wind Farm.
We became involved after potential impacts to an Aircraft Landing Area (ALA) located near the proposed overhead transmission line corridor were identified subsequent to preparation of the original aviation impact assessment (by others). Keith Tonkin was engaged to conduct a comprehensive review of potential aviation impacts, prepare a written report, provide expert advice to the State Commission Assessment Panel hearing, undertake follow up investigations and assist with stakeholder engagement.
Read more about the project here.
